A13 Widening

The A13 corridor in Thurrock links the nationally significant port infrastructure of Tilbury and London Gateway with the M25 and London.  The A13 currently experiences congestion between the A128 and A1014 during peak hours.

The scheme is to widen the A13 from 2 to 3 lanes between the A1089 (Tilbury) and A1014 (Stanford le Hope) to increase highway capacity on the A13, in order to reduce congestion and remove constraints to development, so unlocking the full potential of the corridor to deliver jobs and housing.