A28 Sturry Link Road
This project will deliver a new link road between the A291 and the A28, to the south west of Sturry, Canterbury. The LGF fu...
Search filtering: All Pages News Projects Meetings and Minutes
This project will deliver a new link road between the A291 and the A28, to the south west of Sturry, Canterbury. The LGF fu...
Thurrock is the logistics capital of the country with 2 large ports and a significant and growing logistics park, which ar...
The project will deliver a new train station which will be located approximately 2 miles east of Ramsgate on the Ashford I...
On the north banks of the Thames Estuary in Stanford-le-Hope, Essex, London Gateway is the U.K’s newest and most technologi...
Environment Agency led scheme to reduce flood risk in Newhaven and recognise the wider benefits this will bring in encouragin...
The A13 corridor in Thurrock links the nationally significant port infrastructure of Tilbury and London Gateway with the M25 ...
The LFFN ASELA project received £2,500,000 GBF as part of the original allocation of GBF funding, as part of Phase 2 of t...
The Fisherman’s Quay will be a vibrant, multi-purpose destination which combines a sustainable fishing industry for the loc...
The project will deliver an integrated package of cycling, walking and bus infrastructure, traffic management and public real...
The Discovery Park Incubator project will deliver flexible, collaborative workspace in which life science start-ups and SM...