Carbon Pathways (C-Path)
Carbon Pathway (C-Path) is a dynamic cloud-based resource that will be used to design, facilitate, accelerate and monitor inv...
Search filtering: All Pages News Projects Meetings and Minutes
Carbon Pathway (C-Path) is a dynamic cloud-based resource that will be used to design, facilitate, accelerate and monitor inv...
The A13 corridor in Thurrock links the nationally significant port infrastructure of Tilbury and London Gateway with the M25 ...
The Eastbourne and South Wealden walking and cycling package will deliver a number of routes and complementary measures that ...
The Basildon Integrated Transport Package consists of three tranches, with the aim of delivering traffic management and susta...
This scheme delivers a range of measures designed to improve access to cycling in Medway. The scheme aims to increase overall...
The Mercury Rising 2 Project will create a second-floor extension to the Mercury Theatre in Colchester to provide additional ...
The LFFN ASELA project received £2,500,000 GBF as part of the original allocation of GBF funding, as part of Phase 2 of t...
The LFFN project, is about driving full fibre delivery across ASELA. The additional rollout will aid this goal, by leveraging...
The project focusses on carbon sequestration (the removal of carbon dioxide from the atmosphere), where there is significant ...
The GPF funding will be used to refurbish the Magistrates Court building and convert it into office and small business accom...